Start with the data you already have
Most plants already capture enough to build a first production dashboard. Production logs, downtime records, shift reports, stock movements and purchase orders are usually available in a mix of spreadsheets, an ERP system and paper returns that someone types up.
Rather than waiting for perfect shop-floor instrumentation, start with the daily production record and the stock ledger. They give output, plan attainment and material usage — enough for management to act on.
- Daily production by line, shift and product
- Planned versus actual output
- Downtime events with a cause code
- Material issues, returns and wastage
- Purchase orders and supplier deliveries
Choose KPIs management will actually use
A production dashboard should fit one screen. If it needs explanation, it is a report, not a dashboard.
- Plan attainment (%)
- Output by line and shift
- Downtime hours and top three causes
- Wastage as a percentage of input
- Inventory cover in days
- Cost per unit produced
Model the data before you design the report
The most common cause of a slow, untrusted Power BI report is a flat table copied from a spreadsheet. Build a proper model: a date table, dimension tables for product, line and shift, and fact tables for production, downtime and stock movement. Write the KPIs as DAX measures once, and reuse them everywhere.
Use Power Query to do the clean-up so it repeats identically every refresh, instead of being fixed by hand each month.
Roll it out in three steps
Publish a daily operations view for supervisors first, because they will find the data problems fastest. Then add a weekly view for plant management. Only then build the monthly board pack, once the numbers have been challenged and corrected for a few cycles.
Frequently asked questions
- Do we need an MES before Power BI is worth it?
- No. A structured daily production record and stock data are enough for a first dashboard. An MES improves granularity later.
- How long does a first production dashboard take?
- Where data is available and one owner is assigned, a first working dashboard is typically a matter of weeks rather than months. We confirm the timeline after a short assessment.